Can I run jobs overlapping?
Posted: Thu Dec 12, 2019 7:21 pm
I want to dump image files into a single watch folder, then have them processed by three jobs (like FB, Instagram, Google). The last job should then delete the source images in the watch folder. If I stagger the watch times, with the last one doing the deleting, there is a finite chance that it will run first. However, if the stagger is very small, like two seconds, that chance is also very small. How would you recommend doing this?